Overview
Variations are normal. Losing money on them is not. The pattern is familiar: work is instructed verbally, executed promptly to keep the programme moving, and only later does anyone attempt to establish what it was worth — by which time the instruction is disputed and the measurement is gone.
We build variation packages the other way round. The instruction is captured and traced when it is given, the quantity impact is measured as the work proceeds, the rate is derived from contract principles rather than negotiated from a starting guess, and the whole package is presented in the format the approving authority expects to receive.
Scope
Every element below is covered as standard. Anything outside it is quoted separately and agreed before we begin.
Establishing the origin and authority of the change — written instruction, drawing revision, site direction or client decision — with the contractual basis identified.
Measurement of added, omitted and substituted work, separated from the original scope so the variation stands alone.
New rates built from contract rates where the item is comparable, and from first principles where it is genuinely new.
Full first-principles build-up for extra items with no contract equivalent, presented in the standard analysis format.
Where the variation affects the programme, the delay consequence assessed so time and money are claimed together rather than sequentially.
Complete package with instruction evidence, measurement, rate build-up, drawings and a covering narrative.
Our Approach
01
The register starts at the instruction, not at the invoice. Late-assembled variations are the ones that get reduced.
02
A rate built from contract principles is assessed on its merits. A rate proposed as a round number invites a counter-offer.
03
Where a variation has programme consequence, we claim both at once. Separating them almost always costs the time element.
Questions
If yours is not answered here, call us — the conversation is free and usually short.
+977 1 4538 720Related
Most clients engage two or three of these together, which is usually cheaper than commissioning them separately.
Extension of time submissions built on programme evidence — delay event, notice record, critical path impact and mitigation demons…
Read moreInterim payment certificates prepared on a fixed monthly cycle with all abstracts, deductions, recoveries and tax positions alread…
Read moreMB entries recorded against joint site measurement, cross-checked to approved drawings and signed progressively — the difference b…
Read moreFree scope review · No obligation
A bidding document, a contract, a stalled bill, a stack of unrecorded measurements — whatever the position, a senior engineer will review it and come back within one working day with a written assessment, a timeline and a fixed price. There is no charge for this and nothing to sign.