First-principles item build-up
Labour, material, plant, lead and lift, overhead and profit built up per item and shown component by component.
Engineering Consultancy Service
The website is loading. Please wait.
Quantities & Cost
Item-by-item build-ups from first principles — labour output, material wastage, plant hours, lead and lift, overhead and profit — referenced to the applicable district rate and departmental norms.
Overview
A rate is a claim about how much work a crew does in a day, how much material is wasted, how far it must be carried and what the plant costs to stand idle. When an evaluator or auditor asks how a figure was reached, the answer must be a build-up — not a recollection.
We produce rate analyses from first principles, referenced to the applicable district rate schedule and the relevant departmental norms, with every component visible and adjustable. When a market price moves or a lead distance changes, the rate updates rather than being re-guessed. In twelve years no rate build-up we have submitted has been rejected on technical grounds during evaluation.
Scope
Every element below is covered as standard. Anything outside it is quoted separately and agreed before we begin.
Labour, material, plant, lead and lift, overhead and profit built up per item and shown component by component.
Every component tied to the applicable district rate schedule for the project location and the current fiscal year.
Output rates and material consumption referenced to departmental norms, with any deviation stated and justified.
Haulage distance, terrain factor and vertical lift computed against the actual quarry, source and site conditions.
Hourly owning and operating costs including fuel, operator, maintenance and idle allowance.
Current local material and labour prices verified against the schedule so the analysis reflects reality, not last year's book.
Our Approach
01
Open any cell and the source is visible. Nothing is typed in as a number without a build-up behind it.
02
Change a cement price or a lead distance and every affected rate recalculates. You are never re-doing the analysis from scratch.
03
The build-ups are structured for the questions evaluators actually ask, which is why they so rarely get asked twice.
Questions
If yours is not answered here, call us — the conversation is free and usually short.
+977 1 4538 720Related
Most clients engage two or three of these together, which is usually cheaper than commissioning them separately.
Order-of-magnitude estimates at concept, detailed estimates at tender, and cost-to-complete forecasts during execution — each with…
Read moreBills of quantities measured directly from drawings, structured by work section, with take-off sheets retained so any quantity can…
Read moreContract-clause based adjustment claims computed against published index movements, with base and current period workings presente…
Read moreFree scope review · No obligation
A bidding document, a contract, a stalled bill, a stack of unrecorded measurements — whatever the position, a senior engineer will review it and come back within one working day with a written assessment, a timeline and a fixed price. There is no charge for this and nothing to sign.