Engineering Consultancy
Independent technical advisory from feasibility through defect liability — delivered as a written position you can act on, not a report that describes the problem back to you.
Read moreEngineering Consultancy Service
The website is loading. Please wait.
23 services · 5 disciplines
Engineering consultancy, tender support, quantities and cost, billing and claims, and technical manpower — delivered by one team that stays accountable from first enquiry to retention release.
The Full Range
Most consultancies specialise in one part of the contract lifecycle and hand you off for the rest. We cover the whole span — from the feasibility question before design begins to the retention release years after handover — because the failures we see most often happen precisely at the handoffs.
Engage us for a single rate analysis, an entire tender, a contract-long billing retainer, or a permanent extension of your technical department. The standard of work does not change with the size of the instruction, and neither does the two-stage review every deliverable passes through.
23
Services offered
5
Disciplines
0
Tenders prepared
0
In practice
Discipline 01
Independent advisory, civil and structural design, planning and audit — the work that decides whether a project is buildable before anyone breaks ground.
Independent technical advisory from feasibility through defect liability — delivered as a written position you can act on, not a report that describes the problem back to you.
Read moreCore civil design and detailing for roads, drainage, water supply, retaining structures and site development — dimensioned so the site team can build from it without a phone call.
Read moreAnalysis, design and independent review of reinforced concrete and steel structures, with seismic detailing appropriate to Nepal's hazard exposure.
Read moreBaseline programmes, resource histograms and method statements that reflect how the work will actually be executed — and that hold up as evidence when time becomes contentious.
Read moreA single organised contract record — correspondence, approvals, test results, instructions and photographs — indexed from day one instead of assembled in panic at closeout.
Read moreIndependent verification of executed quantities, workmanship records and payment history — commissioned by owners who need assurance, and by contractors who want to know their position first.
Read moreDiscipline 02
Documentation, proposal writing and e-GP submission handled end to end, with a two-stage compliance check before anything leaves the office.
The single most common reason a competent contractor loses a bid is an incomplete file. We build the submission the way an evaluation committee reads it.
Read moreTechnical proposals, methodologies, work plans and personnel schedules written to score against the actual evaluation criteria — not generic text recycled from the last submission.
Read moree-GP portal submission handled end to end — file preparation, digital signature, upload verification and confirmation receipt, lodged with time to spare.
Read moreDiscipline 03
Rate analysis, estimation and bills of quantities built from first principles, with every take-off sheet and build-up retained and traceable.
Item-by-item build-ups from first principles — labour output, material wastage, plant hours, lead and lift, overhead and profit — referenced to the applicable district rate and departmental norms.
Read moreOrder-of-magnitude estimates at concept, detailed estimates at tender, and cost-to-complete forecasts during execution — each with assumptions and exclusions stated openly.
Read moreBills of quantities measured directly from drawings, structured by work section, with take-off sheets retained so any quantity can be traced back to the dimension it came from.
Read moreDiscipline 04
Measurement books, running bills, escalation, variations and extension of time — the work that turns completed construction into certified payment.
MB entries recorded against joint site measurement, cross-checked to approved drawings and signed progressively — the difference between a bill that is certified and a bill that is argued over.
Read moreInterim payment certificates prepared on a fixed monthly cycle with all abstracts, deductions, recoveries and tax positions already reconciled — so the engineer's only remaining task is to sign.
Read moreContract-clause based adjustment claims computed against published index movements, with base and current period workings presented transparently. Material cost swings should not quietly become your loss.
Read moreVariation proposals with the instruction traced, the quantity impact measured, the new rate derived from contract principles, and the package presented in the format the approving authority expects.
Read moreExtension of time submissions built on programme evidence — delay event, notice record, critical path impact and mitigation demonstrated — rather than on narrative appeals.
Read moreAs-built documentation, final quantity reconciliation, photographic records and the completion narrative required for handover, defect liability release and future prequalification credit.
Read moreDiscipline 05
Screened engineers, sub-engineers and surveyors deployed nationwide, plus resident supervision that keeps executed work matching approved work.
Screened engineers and technicians placed on short-term, project-duration or long-term deployment — credentials verified, and backed remotely by our Kathmandu technical desk.
Read moreNEC-registered graduates through to senior engineers, experienced across building, road, bridge and water infrastructure delivery, deployed on your terms.
Read moreDiploma-qualified sub-engineers for day-to-day site control, quantity recording and supervision of trade works — the layer where most projects are actually won or lost.
Read moreTotal station and GNSS operators for setting out, topographic survey, alignment control and volumetric measurement — including hill alignments through monsoon conditions.
Read moreResident supervision covering quality control, material testing witness, level and line verification, safety observation and daily progress recording — the layer that keeps executed work matching approved work.
Read moreFree scope review · No obligation
A bidding document, a contract, a stalled bill, a stack of unrecorded measurements — whatever the position, a senior engineer will review it and come back within one working day with a written assessment, a timeline and a fixed price. There is no charge for this and nothing to sign.