Joint site measurement
Measurement taken jointly with the engineer's representative at the point the work is available to be measured.
Engineering Consultancy Service
The website is loading. Please wait.
Billing & Claims
MB entries recorded against joint site measurement, cross-checked to approved drawings and signed progressively — the difference between a bill that is certified and a bill that is argued over.
Overview
The measurement book is the primary contemporaneous record of what was built. Everything downstream — the interim certificate, the variation valuation, the final account — rests on it. Yet on many contracts the MB is written up weeks after the work, from memory and rough notes, by whoever is least busy.
We treat measurement as a scheduled discipline. Work is measured jointly at the right moment, recorded in the correct format, cross-checked against approved drawings, and signed progressively rather than in a single retrospective exercise. Contractors who run measurement this way spend a fraction of the time defending their bills.
Scope
Every element below is covered as standard. Anything outside it is quoted separately and agreed before we begin.
Measurement taken jointly with the engineer's representative at the point the work is available to be measured.
Entries recorded in the departmental format with location, dimensions, calculation and reference to the governing drawing.
Every measured quantity verified against approved drawings, with any excess over drawing quantity flagged before it reaches the bill.
Measurement and photographic recording of work about to be concealed — reinforcement, formation, buried services.
MB pages signed as work proceeds rather than in a single exercise at bill preparation.
Rebuilding incomplete or missing measurement records from drawings, site records, photographs and correspondence.
Our Approach
01
Work is measured when it is available and verifiable, not reconstructed later from recollection and rough notes.
02
Where measured quantity exceeds drawing quantity, we raise it before it enters a bill — which is the difference between a variation and a rejection.
03
We have rebuilt measurement records more than a year behind and unlocked stalled certificates within weeks. It is recoverable more often than clients expect.
Questions
If yours is not answered here, call us — the conversation is free and usually short.
+977 1 4538 720Related
Most clients engage two or three of these together, which is usually cheaper than commissioning them separately.
Interim payment certificates prepared on a fixed monthly cycle with all abstracts, deductions, recoveries and tax positions alread…
Read moreA single organised contract record — correspondence, approvals, test results, instructions and photographs — indexed from day one …
Read moreIndependent verification of executed quantities, workmanship records and payment history — commissioned by owners who need assuran…
Read moreFree scope review · No obligation
A bidding document, a contract, a stalled bill, a stack of unrecorded measurements — whatever the position, a senior engineer will review it and come back within one working day with a written assessment, a timeline and a fixed price. There is no charge for this and nothing to sign.