Quality control inspection
Systematic inspection against drawings and specification at defined hold points, with results recorded and non-conformance raised.
Engineering Consultancy Service
The website is loading. Please wait.
People & Site
Resident supervision covering quality control, material testing witness, level and line verification, safety observation and daily progress recording — the layer that keeps executed work matching approved work.
Overview
Supervision exists to close the gap between what was approved and what gets built. That gap opens quietly — a substitution nobody recorded, a cover depth that drifted, a compaction layer that went in thicker than specified. Each is small on the day and expensive at handover.
Our supervision service places engineers on site with a defined inspection regime, a recording standard and a reporting line. They witness the tests, verify line and level against the drawings, record what was built and raise deviation immediately rather than noting it for a monthly report nobody reads in time.
Scope
Every element below is covered as standard. Anything outside it is quoted separately and agreed before we begin.
Systematic inspection against drawings and specification at defined hold points, with results recorded and non-conformance raised.
Attendance at cube sampling, compaction testing and gradation testing, with results verified against specification.
Independent checking of setting out, formation levels and structural positions before work is covered.
Recording of site safety conditions and unsafe practice, reported to your management for action.
Daily record of labour, plant, weather, work executed and events — the contemporaneous record every future claim depends on.
Deviation raised, tracked and closed out with evidence of rectification.
Our Approach
01
A deviation reported the day it happens can be corrected. The same deviation reported monthly has already been built over.
02
Reinforcement, formation and buried services are checked and photographed before concealment, without exception.
03
Our reporting format is designed by the team that prepares claims, so the record is already in the form a claim will need.
Questions
If yours is not answered here, call us — the conversation is free and usually short.
+977 1 4538 720Related
Most clients engage two or three of these together, which is usually cheaper than commissioning them separately.
Screened engineers and technicians placed on short-term, project-duration or long-term deployment — credentials verified, and back…
Read moreMB entries recorded against joint site measurement, cross-checked to approved drawings and signed progressively — the difference b…
Read moreIndependent verification of executed quantities, workmanship records and payment history — commissioned by owners who need assuran…
Read moreFree scope review · No obligation
A bidding document, a contract, a stalled bill, a stack of unrecorded measurements — whatever the position, a senior engineer will review it and come back within one working day with a written assessment, a timeline and a fixed price. There is no charge for this and nothing to sign.